Skyde Clear Kit, Anti-Corrosion Clear-Coat For Bare Metal

Nuvite Chemical

PC3000KIT

Sale price $429.41 Regular price $536.76

Shipping calculated at checkout.

Skyde Clear Kit is the ultimate solution for preventing corrosion on bare metal surfaces such as leading edges, winglets, stabilizers, inlets, and window framing. Its advanced polymeric resin formula utilizes micro-technology to apply a razor-thin, incredibly durable, lightweight, and flexible coating. This preserves the metal's shine and enhances flight efficiency and safety, making it a must-have for aviation experts.

Kit Includes:

  • (2) 10oz Bottles
  • (4) Aluminum Reservoirs
  • (4) Applicators

Approvals

  • SMI Tests & Approvals
    • BSS7432
  • OEM & Airline Approvals
    • Gulfstream

Procedure:

EASY APPLICATION IN 7 STEPS

  1. Clean the work area, gather materials & prep surface.
  2. Pour approximately 1” of Skyde Clear into the reservoir. It avoids waste or spillage.
  3. Submerge the applicator in the reservoir for 5 seconds to absorb the product.
  4. Remove the applicator, allowing excess product to drip off into the reservoir.
  5. Position the applicator at the starting point of the target area. Ensure full surface contact.
  6. In one continuous motion, move the applicator to the endpoint of the application line.
  7. Reload the applicator & repeat the motion, slightly overlapping application lines.

DO NOT overlap after 3 minutes. The previous application line will be tacky.

STARTING POINT/APPLICATION LINE BY COVERAGE AREA

  • Leading Edges: Start inboard, move applicator vertically from top to bottom seam. Repeat motion, moving outboard until coverage area is complete.
  • Horizontal Stabilizers: Start on the topside and move the applicator inboard to the outboard in horizontal application lines. Repeat the motion, moving towards the bottom side until the coverage area is complete.
  • Vertical Stabilizers & Winglets: Start at the top exterior side and move the applicator vertically from top to bottom. Repeat the motion, moving inwards until the coverage area is complete.
  • Inlets: For the top half of the inlet, start at 9 o’clock and work clockwise towards 3 o’clock, moving the applicator from outside to inside the inlet. For the bottom half of the inlet, repeat the motion from 3 o’clock to 9 o’clock until the coverage area is complete.

 

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)

Name Your Own Price!
Name Your Own Price!
Name Your Own Price!